НИЛЕД
Cable termination sleeve internal installation HT2i-12/1x70-120L12 (1PKV-10-70-120) kit for 3 phases SPE without armor; with bolt terminals (pack 3pcs) NILED 16002057
SKU: 16002057
ETIM: EC000910
31,569 ₽
Get back 315 ₽ in points
Promo code
FIRST
— cashback ×3 on your first order: 3% in points on the first 50,000 ₽
Order multiple: 3 шт
Analogues by specifications
Designed for hermetic and safe termination of a cable line when connecting to electrical equipment. End sleeve for a single-core cable with cross-section 70-120 mm2 for voltage up to 10 kV with SPE (cross-linked polyethylene) plastic insulation, unarmored.
Comes with bolt lugs. Bolt size for lugs M12.
Set for 3 phases.
Set is intended for the installation of an indoor sleeve (inside premises).
Suitable for installation on the following cable types: APvV-10, APvP-10, APvP2g-10, APvPg-10, APvPU-10, A1PvPu2g-10, APvPug-10, PvV-10, PvP-10, PvPg-10, PvPu-10, PvPug-10 and their analogs and modifications.
Features:
- Heat-shrinkable tubes with an adhesive layer have high insulation properties, as well as ensuring the tightness and strength of connections.
- The lugs included in the kit have a minimum thread pitch (1 mm), which achieves minimum contact resistance as well as vibration resistance.
- Lugs are compatible with copper and aluminum cable cores.
- The kit includes a sealant that fills voids and irregularities in the cable stripping areas and where the lug bolts are tightened, which achieves equalization of the electric field intensity and tightness.
- All polymer components are halogen-free.
- The sleeve is resistant to mechanical loads, tracking, and temperature fluctuations.
Design
Heat-shrink
Number of cores
1
Rated cross-section at
120 кв.мм
Rated cross-section from
70 кв.мм
Voltage range
10 kV
0
★★★★★
0 reviews
No reviews yet. Be the first!
Leave a review
Related products
2048 ₽
ГринЭнерго Universal cable termination kit 1kV 4PKVNTpB-1-70/120-bn GreenEnergy ge-4-pkvntpb-1-070-120-bn
SKU: ge-4-pkvntpb-1-070-120-bn
1869 ₽
Нева-Транс Комплект Cable termination sleeve internal installation 10kV 10KVTpN-3x(16-25) with bolt lugs Neva-Trans Kit 22020053
SKU: 22020053
1711 ₽
IEK Cable coupling PKVt-10 1x800 b/n PVC/SPE insulation IEK UZM-XLK10-VN1-800X
SKU: UZM-XLK10-VN1-800X
3145 ₽
Подольский ЗЭМИ Universal cable termination kit 1kV 4PKVNTpB-o-50-Pr-Al with Al lugs 9014166 Podolsk 4pkvntpbxox050pral Podolsky ZEMI
SKU: 4pkvntpbxox050pral